[Apr 06, 2023] Powerful C-TS413-2020 PDF Dumps for C-TS413-2020 Questions [Q45-Q67]

Share

[Apr 06, 2023] Powerful C-TS413-2020 PDF Dumps for C-TS413-2020 Questions

Authentic C-TS413-2020 Dumps - Free PDF Questions to Pass


C-TS413-2020 Exam Certification Details:

Duration:180 mins
Languages:German, English
Level:Associate

 

NEW QUESTION 45
Which statements regarding a maintenance order with status RELare correct? Note: There are 3 correct answers to this question.

  • A. The planner can change estimated costs only at header level.
  • B. The planner can change planned costs at operation level.
  • C. Goods receipts for external services can be entered.
  • D. The controller can determine actual cost surcharges.
  • E. Shop papers can only be printed after the order release.

Answer: B,C,E

 

NEW QUESTION 46
Which steps in the maintenance order are directly based on data within the maintenance work center? choose 2 answers

  • A. cost calcluation
  • B. capacity planning
  • C. material availiabilitycheck
  • D. damage analysis

Answer: A,B

 

NEW QUESTION 47
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct Answers to this question.

  • A. Factory calendar
  • B. Start date
  • C. Scheduling indicator
  • D. Scheduling period

Answer: B,D

 

NEW QUESTION 48
Which of the following statements are correct?

  • A. Overhead rates are used to allocate sales and administration overheads.
  • B. Overheads on actual costs are determined automatically when the order is saved.
  • C. Overheads on planned costs are determined as part of the standard cost estimate.
  • D. Overhead rates enable you to allocate overhead costs to costaccounting objects according to cause.

Answer: A,C,D

 

NEW QUESTION 49
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use?

  • A. Call horizon
  • B. Lead float
  • C. Scheduling indicator
  • D. Scheduling period

Answer: D

 

NEW QUESTION 50
A technician uses the new SAPUI5-based apps. which steps can the technician perform when processing a malfunction report? choose 3 answers

  • A. print
  • B. put in process
  • C. start work
  • D. complete
  • E. pause work

Answer: C,D,E

 

NEW QUESTION 51
Which of the following process feature are part of breakdown maintenance? choose 3 answers

  • A. order and notification can be utilized in combination
  • B. notification are used fordocumentation of technical findings and activites performed
  • C. maintenance orders can be created as immediate orders without any planning
  • D. maintenanc order always need planning of maintenance tasks
  • E. order created without notification can be used within the maintenance event builder

Answer: A,B,C

 

NEW QUESTION 52
What must youmaintain before you create the measuring point or counters for technical objects? choose 1 answer

  • A. enter an annual estimate
  • B. create a code group in the necssary catalog
  • C. create necssary characterisitics in the calssification system
  • D. assign characterisics to classes

Answer: C

 

NEW QUESTION 53
You want to assign components to an equipment task list. There isno BOM assigned to the equipment. What is the prerequisite for using the free assignment of material?

  • A. Assign the BOM usage for free assignment of material in Customizing.
  • B. Assign the header material of a material BOM to the equipmenttask list header.
  • C. Free assignment of material is always possible without any prerequisites.
  • D. Assign the header material of a material BOM as assembly to atask list operation.

Answer: A

 

NEW QUESTION 54
Which of the following are true statements about master data?

  • A. Master data is created centrally and is available to all applications and allauthorized users.
  • B. Master data decreases data redundancy.
  • C. Master data is organized into views that are assigned to organizational elements.

Answer: A,B,C

 

NEW QUESTION 55
Why wasthe application code completely rewritten for SAP S/4HANA?

  • A. To take advantage of the simpler data model
  • B. SAP S/4HANA is now built with Java
  • C. To ensurethat the code is optimized for SAP HANA
  • D. The optimized ABAP code that we developed for Suite on SAP HANA would not work with SAP S/4HANA

Answer: A,C

 

NEW QUESTION 56
What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct Answers to this question.

  • A. Add a serialized material to the equipment serial data view.
  • B. Maintain a serial number for an existing equipment master.
  • C. Assign a serial number profile to the related material master.
  • D. Add a serialized material to the construction type field of the equipment master.
  • E. Assign a serial number profile to the equipment category.

Answer: A,C,D

 

NEW QUESTION 57
What are the three implementation scenarios covered by SAP Activate?

  • A. Database migration
  • B. New implementation
  • C. Landscape transformation
  • D. System conversion

Answer: B,C,D

 

NEW QUESTION 58
What are the key functionalities in SAP Cloud Platform?

  • A. Integration
  • B. Open APIs
  • C. Edge computing
  • D. Microservices

Answer: A,B,D

 

NEW QUESTION 59
The planner must add an activity to a notification which must be executed in the future. Which option in the notification, that can be predefined in a catalog does the planner use? choose 1 answer

  • A. a task in the notification header
  • B. an activity in the notification item
  • C. a text in the notification item
  • D. a text in the subject long text screen

Answer: A

 

NEW QUESTION 60
Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct Answers to this question.

  • A. Organizational unit (HR)
  • B. Capacity category
  • C. Fixed price of the activity type
  • D. Calculation key

Answer: A,B

 

NEW QUESTION 61
You want to view transactional and analytical processing data in the Technical Object Breakdowns SAP Fiori app. What is the source of the information?

  • A. BW InfoCube
  • B. InfoSet for SAP Query
  • C. BW query
  • D. Core Data Services (CDS view)

Answer: D

 

NEW QUESTION 62
In which of the following locations can object information be found?

  • A. In an order
  • B. In a notification
  • C. In a document
  • D. In a master record for the technical object

Answer: A,B,D

 

NEW QUESTION 63
Which options do you have to allow the assingment of order operation to object list entries. choose 3 answer

  • A. only to notifiaction created via maintenance plans
  • B. to all object list entries
  • C. to all notification
  • D. to all maintenance plans
  • E. to all task list

Answer: A,B,C

 

NEW QUESTION 64
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct Answers to this question.

  • A. Referenced notifications are put In Process again.
  • B. Open reservations are recompiled.
  • C. Open purchase orders are recompiled.
  • D. Open purchase requisitions are recompiled.

Answer: B,D

 

NEW QUESTION 65
The installation locations for equipment in a technical system are documented in the ___________.

  • A. Usage List
  • B. Measuring Points
  • C. Equipment View
  • D. Job List

Answer: A

 

NEW QUESTION 66
You are planning maintenance execution on the emplyee level. Which combination of SAP objects is mandatory within SAP S/4 HANA? choose 1 answer

  • A. planner group and personnel number
  • B. business partenerand personnel number
  • C. ogranizational unit and personnel number
  • D. SAP user and personnel number

Answer: C

 

NEW QUESTION 67
......

Guaranteed Accomplishment with Newest Apr-2023 FREE: https://www.actualcollection.com/C-TS413-2020-exam-questions.html