2022 Realistic Verified Free The Open Group OG0-092 Exam Questions [Q11-Q28]

Share

2022 Realistic Verified Free The Open Group OG0-092 Exam Questions

OG0-092 Real Exam Questions and Answers FREE


Unit 21: Architecture Partitioning

The students need to have competency in:

  • describing how Architecture Partitioning can be utilized in the framework of the ADM Preliminary Phase.
  • describing the Architecture Partitioning purpose;
  • describing the classification criteria for architectures & solutions when considering partitioning;

Instead of taking each chapter one by one, we consider that it is important for candidates to understand the TOGAF standard first. It includes a verified Architecture framework and methodology that have been used by some of the top organizations in the world to improve their business processes and efficiency. The business environment recognizes it as one of the most reliable Enterprise Architecture standards.

Once an examinee manages to succeed in OG0-092 and become TOGAF 9 certified, he/she will get validation that he/she has the necessary knowledge and understanding of how TOGAF 9 Foundation works. A candidate who reached this level will be able to apply and analyze the TOGAF type of knowledge. In addition, the individuals who take this exam will need to demonstrate their ability on applying all ADM phases during the development process of an Enterprise Architecture. They will also show their proficiency in applying Architecture Governance in developing the necessary features of Enterprise Architecture that work for their business needs.

Besides, exam-takers will show what pros they are in applying the TOGAF Architecture Content Framework. They will also know how to handle the features of building blocks and know how to apply the Stakeholder Management Technique. Another expertise that applicants will demonstrate in this OG0-092 exam will be on using TOGAF Content Metamodel to improve business processes. They will also have to answer questions related to the most recommended TOGAF techniques that can be used when developing an Enterprise Architecture model that works for certain business environments.

During such an exam, applicants will as well need to find the correct answer when they are asked how they would customize a TOGAF Technical Reference Model to meet their business needs. Also, they will be asked about the Integrated Information Infrastructure Reference Model (III-RM) and the most important deliverables used by the ADM cycle. Candidates should also demonstrate that they are skilled in portioning an Enterprise Architecture in such a way so that it meets the organization's most important needs.

Last but not least, examinees will have to show that they have a clear view of what the main purpose of the Architecture Repository is and its uses in the organization. They will have to show their professionalism in applying different levels and iteration in architecture with the help of the ADM infrastructure. Besides, they should be able to quickly adapt to using the right ADM features achieving the highest level of security. In addition, they should have the architecture maturity models' role very clear in their minds. Therefore, they will be able to develop an Enterprise Architecture and adapt it to their business challenges. Lastly, apart from understanding the purpose that the Architecture Skills Framework has, test-takers should demonstrate that they also know how to apply it properly.

 

NEW QUESTION 11
SureFlight Air Carrier has received approval for the acquisition of a regional carrier.
To integrate the new acquisition, a TOGAF based enterprise architecture program has been initiated. The CIO sponsors the activity supported by the Chief Architect.
In Phase A within the initial iteration the CIO wants to ensure that the architecture activities are recognized among the various stakeholders of the enterprise.
Refer to the scenario above
You are a consultant supporting the Chief Architect that should explain how to identify and engage the stakeholders at this stage of the program.
Identify the best answer accordingly to the TOGAF 9 guidelines.
Choose one of the following answers

  • A. You identify all the main stakeholders on both the acquired carrier and the rest of the enterprise. Using a stakeholder map, you classify and record their power in relation to this activity. You then focus on implementing the relevant viewpoints that can address the concerns of every main stakeholder identified in the stakeholders map.
  • B. Using the business scenarios technique you would identify supporting and not supporting stakeholders.
    Then you would list the set of viewpoints that are addressing the stakeholder concerns and share these with them.
  • C. You conduct a pilot proof of concept during Phase A to demonstrate the technical feasibility to the stakeholders explaining the approach available from your preferred suppliers.
  • D. You first priority is to communicate with the regional carrier stakeholders developing a Communications Plan to share main features and discuss opportunities with them.

Answer: A

 

NEW QUESTION 12

  • A. You would assess how the plan impacts the other frameworks in use in the organization. The plan should be coordinated with the business planning, portfolio/project management and operations management frameworks. You would then assign a business value to each project, considering available resources and priorities for the projects. Finally, you would generate the Implementation and Migration Plan.
  • B. You would conduct a series of Compliance Assessments to ensure that the implementation team is implementing the architecture according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements should be identified and updated in the Implementation and Migration Plan.
  • C. You would apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. You would confirm the Transition Architecture phases using an Architecture Definition Increments Table to list the projects. You would then document the lessons learned and generate the final plan.
  • D. You would place the strategic Architecture Definition and Transition Architectures under configuration control as part of the ongoing architecture development cycle. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. You would then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be accepted by the Architecture Board as changes to the architecture without review.
  • E. Based on all of these factors they have produced a risk assessment.
    The implementation process is estimated to take four years. Because of the risks posed by the complexity of the current environment, a phased approach is needed to implement the target architectures. The implementation and Migration Plan v0 1, the draft Architecture Roadmap, and the Capability Assessment deliverables are now complete.
    Refer to the Scenario
    You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.
    Based on TOGAF standard, which of the following is the best answer?

Answer: A

 

NEW QUESTION 13
Scenario: Florian Flowers BV
Please read this scenario prior to answering the question
Florian Flowers BV is an international agricultural company exporting flowers and seeds worldwide. Florian is headquartered in Rotterdam in the Netherlands, and has sales and distribution centers in over 60 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities.
To achieve full integration of their research capabilities with their development centers located in various climate zones, Florian wants to develop strong self-directed teams in each location. Florian also wants to define new business models that are profitable while reducing their impact on the environment. Florian management is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes.
Florians international operations are subject to various legal and regulatory requirements. In areas such as genetically modified seeds, governmental controls are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds.
The Governing Board is concerned, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested to be informed about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs.
TOGAF 9 has been mandated as the guiding framework for the development and evolution of the Enterprise Architecture practice.
Refer to the Florian Flowers BV Scenario
Florian management has engaged you as the Lead Consultant to assess the current situation.
You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of all these parties.
Based on TOGAF 9, which of the following is the best answer?

  • A. For those groups that have sufficient power and level of interest, a special report should be created that summarizes the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders' requirements.
  • B. It would be beneficial to develop a stakeholder map that allows the architects to define groups of stakeholders that share common concerns. A set of views should be defined that addresses the concerns each group. Architecture models can then be created for each view to address the stakeholders' concerns.
  • C. Depending on the nature of the architecture, a set of models should be created that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should be able to view the models to see that their concerns have been properly addressed.
  • D. Each architecture activity should be developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been accessed.

Answer: C

 

NEW QUESTION 14
Patterns & Co. is introducing a Commercial Off-the-Shelf (COTS) Market Analytics solution in order to improve its new delivery service.
Patterns & Co. has a mature enterprise architecture capability and the CIO is the sponsor of the enterprise architecture team. The business vision and requirements for the new system are defined. It includes a detailed business process analysis. The supplier has proposed a solution but the Architecture Board identified some of the project requirements not consistent with the adopted infrastructure standards. The CIO considered the risks and approved the implementation.
The CIO has asked the EA team to execute the Phase G ensuring that the system performance KPIs are respected, the project remains within budget and security guidelines are met.
Refer to the scenario above As Lead Enterprise Architect you have to recommend a plan to implement the CIO decision. Choose the best answer according to TOGAF 9.
Choose one of the following answers

  • A. You recommend the co-existence of a second web server standard and modify the company Standards Information Base adding this new technology.You ask the project architects to create an Architecture Contract with the development teams. You identify the need of a performance testing and a compliance review You agree with the business on SLA and delivery dates. You identify re-usable procedures and objects.
  • B. You eliminate the non-standard web server from the solution as recommended by the Architecture Board.
    You create a revised plan and Architecture Contract for the development stressing the re-use of standard technologies. You share the budget implication of this solution with a finance committee and inform the CIO of the long term cost benefits of this choice. You define periodical project management meetings to monitor compliance.
  • C. You ask the supplier to modify the web server hardware and software components so they can meet the current infrastructure standards. You advise to execute a proof of concept to anticipate any coding issue.
    Then, after the agreement with the development leads for supporting the development, you will provide the project plan to the project manager and develop an Architecture Contract. A set of frequent operational reviews to monitor the solution's performance is then scheduled after the implementation is completed.
  • D. You execute a risk analysis and set deliverables and timing requirements with the development team. You implement a detailed impact analysis of the chosen solution. You create an Architecture Contract and ask for the CIO's approval before implementing it. You test the solution just prior to implementation and deliver the project artifacts and store after the completion of the implementation.

Answer: A

 

NEW QUESTION 15
Scenario: Rollins Manufacturing
Please read this scenario prior to answering the question
Rollins Manufacturing is a major supplier in the automotive industry, headquartered in Cleveland, Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been operating its own Manufacturing Requirements Planning (MRPII) system, production scheduling, and custom developed applications that drive the automated production equipment at each plant.
Rollins is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current MRPII and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.
The Rollins Enterprise Architecture department has been operating for several years and has mature, well- developed architecture governance and development processes that are strongly based on TOGAF 9.At a recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.
The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their MRPII and production scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns can be addressed.
Refer to the Rollins Manufacturing Scenario:
You are serving as the Lead Enterprise Architect for the Common ERP Deployment architecture project.
One of the earliest initiatives in the Enterprise Architecture program at Rollins was the definition of a set of IT principles and architecture principles that are well aligned with the overall enterprise principles. These now need to be updated to address the concerns raised.
You have been asked to select a set of principles most appropriate for guiding the team to define a robust solution.
[Note: You should assume that Rollins has adopted the example set of principles that are listed and defined in TOGAF 9, Section 23.6.] Based on TOGAF 9, which of the following is the best answer?

  • A. Information Management is Everybody's Business, IT Responsibility, Data Trustee, Technology Independence, Responsive Change Management.
  • B. Common-use Applications, Data is Shared, Data is Accessible, Data is Secure, Interoperability, Control Technical Diversity.
  • C. Maximize Benefit to the Enterprise, Business Continuity, Common-use Applications, Data is Shared, Data is Accessible, Data is Secure.
  • D. Business Continuity, Service-orientation, Data is Accessible, Data is Secure, Responsive Change Management.

Answer: C

 

NEW QUESTION 16
Scenario: Summer Seeds BV
Please read this scenario prior to answering the question
Summer Seeds BV is an international agricultural company exporting bulbs, flowers and seeds worldwide. It is headquartered in Rotterdam in the Netherlands, and has sales and distribution centers in over 60 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities. To achieve full integration of their research capabilities with their development centers located in various climate zones, the company wants to develop strong self directed teams in each location. It also wants to define new business models that are profitable while reducing their impact on the environment. The management is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes. Summer Seed's international operations are subject to various legal and regulatory requirements. In areas such as genetically modified seeds, governmental controls are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds. The Governing Board is concerned, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested information about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs. TOGAF 9 has been mandated as the guiding framework for the development and evolution of the Enterprise Architecture practice.
Refer to the Summer Seeds BV Scenario
You have been appointed as the Lead Consultant. You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of all these parties. Based on TOGAF 9, which of the following is the best answer?

  • A. A stakeholder map should be developed that allows the architects to define groups of stakeholders sharing common concerns. A set of views should then be defined that addresses the concerns for each group-Architecture models can then be created for each view to address the stakeholders' concerns.
  • B. Each architecture activity should be developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been addressed,
  • C. For those groups that have sufficient power and level of interest, a special report should be created that summarizes the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders' requirements.
  • D. Depending on the nature of the architecture, a set of models should be created that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should be able to view the models to see that their concerns have been properly addressed.

Answer: D

 

NEW QUESTION 17
FreshFruit Int. is an online American grocer. The Executive Board decided to implement a new strategy to expand the business to other markets.
The CIO is sponsoring an enterprise activity to support the expanded operations.
A new solution is rolled-out to replace the legacy online sales platform. A compliance review was performed to assess the solution implementation.
The result of the review highlighted a complaint from the development team stating that the new system is difficult to integrate with the existing warehouse automation systems. The Chief Architect is concerned that the complaint is not related to a real problem of the solution but is based on personal preferences of the development teams. Another interview with the project team is scheduled.
Refer to the scenario above You are the Lead Architect and an architect from your team leads the review team. You have to answer how, based on TOGAF 9, you should enable the review team to conduct the reviews successfully.
Choose one of the following answers

  • A. You organize a meeting with the review team and state the importance to identify any non-compliancy that may have come from the implemented solution.
  • B. Meeting with the project architect you clarify the purpose of the review. You ask to perform an objective and fair review using the checklists to frame the review and clarify that you want them to identify the issues behind the implementation team complaints.
  • C. You verify that criteria for the program and the business objectives are mapped in the checklists that the project team prepared for the interviews. You confirm the checklist content to the project architect and stress the need to be objective and fair during the review process.
  • D. You organize a meeting with the review team and stress the importance of a high degree of compliance without any exception. The review should cover every aspect of the implementation and should criticize the implementation techniques.

Answer: C

 

NEW QUESTION 18
UTrack Transports is a strong UK logistics company. The head of the strategic marketing division engaged the Principal Architect issuing a Request for architectural work to design an enhancement of the current Enterprise Data Warehouse system. An enhancement is needed to support the change in the business model; UTrack wants to leverage on customer data collected during business as usual activities and anonymize them to offer marketing agencies a fresh and accessible source of analytics data, this will increase the company revenues.
TOGAF 9 is the architectural framework in use.
Refer to the scenario above The Principal Architect has decided to ask you as Business Intelligence Subject Matter Expert to design the Data Architecture. The Chief Architect shared with you the Architecture Definition Document including the Business Architecture design. You now need to choose the artifacts you want to produce as part of the Data Architecture design. Identify the best answer accordingly to the TOGAF 9.
Choose one of the following answers

  • A. You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are stored. You then assign ownership of data entities to the organization via a System/Data Matrix.
  • B. You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are stored. You then classify what the data source are and the relationship with the data entities via a System/Data Matrix.
  • C. You first list the data used across the enterprise using a Data Entity/Data Component Catalog, including data entities and also the data components where data entities are stored. You then classify what the data source are and the relationship with the data entities via a System/Data Matrix. You finally identify common data requirements using a Data Lifecycle Diagram.
  • D. You first list the data used across the enterprise using a Data Entity/Data Component Matrix, including data entities and also the data components where data entities are stored. You then classify what the data source are and the relationship with the data entities via a Role/System Catalog. You finally identify common data requirements using a Data Use Case Diagram.

Answer: C

 

NEW QUESTION 19
Scenario:
Please read this scenario prior to answering the Question
You have been assigned the role of Lead Enterprise Architect for a manufacturing firm that specializes in
musical instruments. The firm has been established for over 100 years, operating in North America for most of
that time. In the last ten years, the firm has expanded into European markets and will soon establish a market
in Latin America. A future expansion into the Asia Pacific region is also planned.
The firm is organized into several business units that each focus on manufacturing particular families of
instruments such as brass, woodwind, and percussion. Each business unit has acquired other producers to
expand its manufacturing capacity. This has resulted in a complex environment with a high diversity of
business and manufacturing systems.
The Enterprise Architecture (EA) program within the firm has been functioning for several years. It has made
significant progress in consolidating the technology portfolio and establishing key standards. The CIO and the
COO are pint sponsors of the EA program. The EA program is mature, with an active Architecture Board and a
well-defined architecture process and standard content templates based on the TOGAF 9 Architecture Content
Framework. The EA process framework is well coordinated with the PMO, Systems Development, and
Operations functions.
The firm has completed a strategic plan to reorganize its Sales & Marketing organization according to the four
target geographic markets. One of the goals of this reorganization is to improve the ability of Marketing to
collect more meaningful market analytics that will enable each sector to better address market needs with
effective marketing campaigns and global product presence.
A Request for Architecture Work to address the goals of the reorganization has been approved. As the
architecture team commences its work, the CIO has expressed concerns about whether the firm will be able to
adapt to the proposed architecture and how to manage the associated risks.
Refer to the Scenario
You have been asked how to address the concerns of the CIO.
Based on TOGAF 9, which of the following is the best answer?

  • A. In Phase A the team should analyze their risk by completing an Implementation Factor Assessment and
    Deduction Matrix to identify the particular risks associated with the implementation and deployment. The
    matrix should include a list of factors to be considered, their descriptions, and constraints that should be
    taken into account. These factors can then used to assess the initial risks associated with the proposed
    architecture.
  • B. In Phase A, the team should conduct a Business Scenario to identify the stakeholders' concerns and the
    resulting retirements. Once the retirements have been identified, they can be assessed in terms of their
    risks. The risks should be evaluated in terms of how they could be avoided, transferred, or mitigated. Any
    risks that cannot be resolved should be identified as residual risks and their disposition should be decided
    by the Architecture Board.
  • C. In Phase B, the team should create a set of views that will enable them to identify the factors that will
    influence the successful introduction of the architecture into the organization. There should then be an
    assessment of each factor on a maturity scale that will allow the team to gauge the urgency, readiness, and
    degree of difficulty to fix. These factors can then be used to assess the initial risks associated with the
    proposed architecture.
  • D. In Phase A, the team should use the Business Transformation Readiness Assessment technique to identify
    the factors that will influence the successful introduction of the architecture into the organization. The
    assessment should include determining the readiness rating for each factor based on a maturity scale that
    will allow the team to gauge the urgency, readiness, and degree of difficulty to fix. These factors can then
    used to assess the initial risks associated with the proposed architecture.

Answer: D

 

NEW QUESTION 20
Scenario:
Please read this scenario prior to answering the question
Your role is consultant to the Lead Architect within a company that manufactures a variety of small electromechanical devices. As part of a corporate-wide Lean Manufacturing initiative, the company has defined a strategic architecture to improve its ability to meet consumer demand and improve its ability to manage its supply chain. The strategic architecture called for the consolidation of multiple Enterprise Resource Planning (ERP) applications that have been operating independently in several of the divisions' production facilities. The goal is to replace the functionality of the existing applications with a new ERP product running as a single instance in the company's primary data center.
The company has a mature enterprise architecture practice and uses TOGAF 9 for the basis of its architecture framework. In addition to the EA program, the company has a number of management frameworks in use, including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.
Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufacturing requirements.
The enterprise architects have analyzed the key corporate change attributes and implementation constraints. A consolidated gap analysis has been completed which has identified the gaps across the Business, Data, Application, and Technology domains. Based on the results of the gap analysis, the architects have reviewed the requirements, dependencies and interoperability requirements needed to integrate the new ERP environment into the existing environment. The architects have completed the Business Transformation Readiness Assessment started in Phase

  • A. You would assess how the plan impacts the other frameworks in use in the organization. Minimally, the plan should be coordinated with the business planning, portfolio/project management and operations management frameworks. You would then assign a business value to each project, taking into account available resources and priorities for the projects. Finally, you would generate the Implementation and Migration Plan.
  • B. You would conduct a series of Compliance Assessments to ensure that the implementation team is implementing the architecture according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements should be identified and updated in the Implementation and Migration Plan.
  • C. You would apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. You would confirm the Transition Architecture phases using an Architecture Definition Increments Table to list the projects. You would then document the lessons learned and generate the final plan.
  • D. You would place the strategic Architecture Definition and Transition Architectures under configuration control as part of the ongoing architecture development cycle. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. You would then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be accepted by the Architecture Board as changes to the architecture without review.
  • E. Based on all of these factors they have produced a risk assessment.
    Because of the risks posed by the complexity of the current environment, it has been determined that a phased approach is needed to implement the target architectures. The overall implementation process is estimated to take several years.
    Refer to the Scenario The Implementation and Migration Plan v0.l, the draft Architecture Roadmap, and the Capability Assessment deliverables are now complete. You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.
    Based on TOGAF 9, which of the following is the best answer?

Answer: A

 

NEW QUESTION 21
Scenario: Zephyr Enterprises
Please read this scenario prior to answering the question
Zephyr Enterprises specializes in the development of wind turbine blades for use in large-scale commercial wind energy production systems. Zephyr has manufacturing facilities located in Palm Springs, California, Omaha, Nebraska, and Winnipeg, Ontario. Each of these plants supplies a different manufacturer that builds and sells complete systems. The turbine blades are custom engineered to meet each manufacturers design specifications.
Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics. However, recent improvements in composite materials, coupled with enhanced automated methods for precision application of materials during the molding process, have led to significant reduction in weight, increase in strength, and greatly improved blade longevity. Zephyr has pioneered the development of a proprietary automated process for continuous extrusion of the turbine blades. Patents have been filed to protect the process, but certain trade secrets must be closely guarded.
Zephyr has a mature Enterprise Architecture organization that is supported by a cross-functional Architecture Review Board. The Chief Information Officer and the Chief Operating Officer cosponsor the Enterprise Architecture program.
Zephyr has used TOGAF and its Architecture Development Method (ADM) to develop its automated manufacturing processes and systems that are used to design, manufacture, and test the blade assemblies. They have recently updated to TOGAF 9 and have adapted the Zephyr Enterprise Architecture to closely follow the TOGAF 9 framework. All of Zephyrs IT architects have been trained and certified on TOGAF 9.Recently, an architecture project was completed that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Manufacturing Architecture Board approved the plan for immediate implementation at each plant.
An Architecture Contract was developed that detailed the work needed to implement and deploy the new Automated Test System controller. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each site to ensure consistency.
Refer to the Zephyr Enterprises Scenario:
You have been assigned by the Lead Architect for the Automated Test System controller project to conduct Compliance Assessments at each manufacturing plant.
During the course of the assessment at the Omaha plant, you discover that the Distributed Data Acquisition System they have purchased uses a proprietary Remote Procedure Call (RPC) that utilizes kernel mode threads instead of the user mode threads that are specified in the Architecture Definition Document. In all other respects, the system meets the requirements stated in the Architecture Definition Document and seems to perform correctly.
You have been asked to describe the compliance of this system for the final report.
Based on TOGAF 9, which of the following is the best answer?

  • A. You observe that the system has many features in common with the Architecture Definition Document, and those features have been implemented in accordance with the specification. However, you note that the RPC mechanism has been implemented using features that are not covered by the specification. Your recommendation is that the system be described as consistent.
  • B. You observe that the implementation of the RPC mechanism has no features in common with the Architecture Definition Document, therefore the question of its conformance should not be considered. Your recommendation is that the system be described as consistent.
  • C. You observe that the system meets most of the requirements stated in the Architecture Definition Document and appears to work correctly. However, you note that the RPC mechanism has not been implemented according to the specification. Your recommendation is that the system be described as non-conformant.
  • D. You observe that all of the features in the Architecture Definition Document have been implemented in accordance with the specification, except for the RPC mechanism. Your recommendation is that the system be described as conformant.

Answer: C

 

NEW QUESTION 22
Please read this scenario prior to answering the question
Your role is that of Lead Enterprise Architect for a chain of convenience stores. The chain includes over 15,000 retail outlets throughout the Asia-Pacific region. Each store in the chain is an independently owned and operated franchise. The stores operate 24 hours a day and 7 days a week. Many of the stores have been wirh the franchise for more than 10 years and still use the original IT systems deployed at that time.
The CEO of the chain has stated his concerns about the inefficiencies of the current systems and identified the need to change. He has defined a new strategic vision that will enhance the business by providing its franchisees new services to help them complete with other retail outlets and online retailers. This strategy is part of the long-term commitment to enhance the brand image and increase revenue for the chain. He has also stated that he expects improved financial results by the end of the current fiscal year.
The changes will help provide the chain with improved products, and more efficient operations. The stores will also act as delivery and return locations for a large online retailer which will further increase the number of potential customers. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising and new products to specific regions.
The chain has a mature Enterprise Architecture practice based in its headquarters and uses the TOGAF standard as the method and guiding framework. The CIO is the sponsor of the activity.
The Chief Architect engaged the services of a leading consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO's vision. This recently completed with approval of a strategic architecture encompassing the entire chin, including detailed requirements and recommendations.
Based on the recommendations from the initial study, the decision for the chain to adopt a packegd suite of integrated applications that is tailored to the needs of the franchise has been taken.
Refer to the scenario
You have been asked by the Chief Architect to propose the best approach for architecture development to realize the CEO's vision.
Based on the TOGAF Standard, Version 9.2 which of the following is the best answer?

  • A. You proposed that the target architecture is defined first, followed by transition planning. This is because the vision is well understood and the strategic architecture agreed. The target first approach will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.
  • B. You propose that the team focus on architecture definition with a specific emphasis on understanding the strategic change parameters of the business strategy. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagement. You would ensure that the target architecture addresses non-functional requirements so as to ensure the target architecture is robust and secure.
  • C. You propose that the team focus on defining the target architecture by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.
  • D. You propose that his engagement define the baseline architecture first in order to assess the current infrastructure capcity and capability. The initial priority is to understand the problem. Then the focus should be on transition planning and architecture deployment. This will identify requirements to ensure that the prjects are sequenced in an optimal fashion so as to realize the vision.

Answer: A

Explanation:
Explanation/Reference:

 

NEW QUESTION 23
Scenario -
You have been appointed as a consultant to the Chief Enterprise Architect of a multinational corporation. The corporation has over 100,000 employees and is organized into 10 divisions with operations in over 60 countries and products sold in over 125 countries. It has major research sites at 8 locations worldwide.
The operations of the corporation are subject to legal and regulatory requirements for each country where they operate. The production of its products have governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was conducting a trial for a new product.
The Enterprise Architecture group within the company has been engaged in an architecture development project to create a secure collaboration system that will allow researchers at its product development laboratories worldwide to share information about their clinical trials. This system will also connect with external partners.
The Enterprise Architecture group is a mature organization. They use the TOGAF ADM with extensions required to support the manufacturing practices and laboratory practices of their target markets. Due to the high sensitive nature of the information that is managed, special care was taken to ensure that each architecture domain included an examination of the security, regulatory and privacy issues that are relevant.
The Executive Vice President for Clinical Research in the sponsor of the Enterprise Architecture activity. She has stated that the changes to the Enterprise Architecture for the new system will need to be rolled out on a geographic basis that will minimize disruptions to ongoing clinical trials. The work will need to be done in stages and rolled out in geographic regions.
You have been asked to recommend the approach to identify the work packages that will be included in the Transition Architecture(s).
Based on the TOGAF standard, which of the following is the best answer?

  • A. You would use a Consolidated Gaps, Solutions and Dependencies Matrix as a planning tool. For each gap, you would classify whether the solution is either a new development, purchased solution, or based on an existing product. You would group the similar solutions together to define the work packages.
    You would then regroup the work packages into a Set of Capability Increments to transition to the Target Architecture taking into account the schedule for clinical trials.
  • B. You would document the factors impacting the Implementation and Migration Plan and group the gaps identified in the domain architecture gap analysis results. For each gap, you would identify a proposed solution and classify it as a new development, purchased solution, or based on an existing product. You would group similar solutions together to form work packages, and identify dependencies between the work packages factoring in the clinical trial schedules. Finally, you would regroup the packages into a set of Capability increments scheduled into a series of Transition Architectures.
  • C. You would group the Solution Building Blocks from a Consolidated Gaps, Solutions and Dependencies Matrix into a set of work packages. Using the matrix as a planning tool, you would then regroup the work packages to account for dependencies. You would sequence the work packages into the Capability Increments needed to achieve the Target Architecture. You would schedule the rollout one region at a time. Finally, you would document the progression of the Enterprise Architecture using a state evolution table.
  • D. You would determine the set of Solution Building Blocks required by identifying which need to be developed and which need to be procured. You would eliminate any duplicate building blocks, and then group the remaining Solution Building Blocks together to create the work packages using a CRUD matrix. You would then rank the work packages in terms of cost, and select the most cost-effective options for inclusion in a series of Transition Architectures. Finally, you would schedule a sequential roll out of the work packages across the geographic regions.

Answer: D

 

NEW QUESTION 24
Scenario:
Please read this scenario prior to answering the Question
You have been appointed as a consultant to the Lead Enterprise Architect of an international agricultural company that exports bulbs, flowers and seeds worldwide. The company has its headquarters in the Netherlands, and has sales and distribution centers in over 30 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities.
To achieve full integration of their research capabilities with their development centers located in various climate zones, the company wants to develop strong self-directed teams in each location. It also wants to define new business models that are profitable while reducing their impact on the environment. The management team is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes.
The international operations of the company are subject to legal and regulatory requirements for each country where they operate. The production of genetically modified seeds has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds.
The Governing Board is concerned about the risks posed in this complex global environment, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested to be informed about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs.
TOGAF 9 has been mandated as the framework for the development and evolution of the Enterprise Architecture practice. The Preliminary Phase has been completed to establish the enterprise architecture capability for this project.
Refer to the Scenario
You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Governing Board, legal staff, auditors and the research organization.
Based on TOGAF 9, which of the following is the best answer?

  • A. You recommend that a stakeholder map be developed. This will allow the architects to define groups of stakeholders that share common concerns. A set of views should be defined to address the concerns for each group of stakeholders. Architecture models should then be created for each view to address the stakeholders' concerns.
  • B. You recommend that a special report be created for those groups that have sufficient power and level of interest. This report should summarize the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders1 requirements.
  • C. You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should then view the models to verify that their concerns have been properly addressed.
  • D. You recommend that each project architecture activity is developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been addressed.

Answer: A

 

NEW QUESTION 25

  • A. Based on all of these factors they have produced a risk assessment. They have also completed the Implementation and Migration Plan v0.1, the draft Architecture Roadmap, and the Capability Assessment deliverables.
    Because of the risks posed by the complexity of the current environment, it has been determined that a phased approach is needed to implement the target architectures. The overall implementation process is estimated to take several years.
    Refer to the Scenario
    You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.
    Based on TOGAF Standard Version 9.2, which of the following is the best answer?
  • B. You recommend that the enterprise architects apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. They should confirm the Transition Architecture phases using an Architecture Definition Increments Table to list tine projects. They should then document the lessons learned and generate the final Implementation and Migration Plan.
  • C. You recommend that the enterprise architects assess how the plan impacts the other frameworks in use in the organization. Minimally, the plan should be coordinated with the business planning, portfolio/project management and operations management frameworks. They should then assign a business value to each project, taking into account available resources and priorities for the projects. Finally, they should generate the Implementation and Migration Plan.
  • D. You recommend that the enterprise architects place the Architecture Definition Document under configuration control. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. They should then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be applied as changes to the architecture without review.
  • E. You recommend that the enterprise architects conduct a series of Compliance Assessments to ensure that the architecture is being implemented according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements should be identified and updated in the Implementation and Migration Plan.

Answer: D

 

NEW QUESTION 26
Scenario: AutoComp Corporation
AutoComp Corporation produces components for the Car industry. Driven by the global financial downturn they are looking to reduce IT costs. They believe there is a cost saving opportunity within IT but this is not quantified in terms of potential savings nor is there agreed target architecture.
Final decisions on the solutions are not yet fully agreed. They have completed their Vision Phase and first pass of the three architecture definition phases and now they want to finalize and plan their solutions. You are the Chief Architect from a consulting organization brought into review the work to date by AutoComp Corporation and to make recommendations to the CIO and the board on this.
Which of the following answers best describes how TOGAF recommends in this context?

  • A. I would do a Consolidated Gap Analysis by considering then dependencies, then group and allocate the transitions. I would then look to produce artifacts that describe the recommended projects, the risk, issues and dependencies. This would also include transition architects to move us from current architecture to the recommended target architectures. I would present my recommendations to the board for agreement. Once this is done, I would update the architectures reflecting any changes resulting from the board discussion.
  • B. I would after confirming Enterprise Change Attributes and constraints, do a Consolidated Gap Analysis then dependencies, then group and allocate the transitions. I would also assess Enterprise readiness and risks.
    Then I would also assess the business value of the solutions, do risk analysis with mitigation and then schedule the work products.
  • C. I would determine the business value of each solution, prioritize accordingly each set of solutions, conduct detailed Risk Assessment and Mitigation, do Compliance reviews and then implement the solutions. I would present my recommendations to the board for agreement. Once this is done, I would update the architectures reflecting any changes resulting from the board discussion.
  • D. I would look at the corporate culture and attitude to change, understand the constraints such as cost and the required time horizons. I would then look at the architecture work to ensure it is complete and seek to address any gaps. I would review the functional requirements and ensure there are complete interoperability requirements. I would then validate any dependencies and risks. Then formulate an implementation and migration strategy identifies major work packages and the transition architecture required. Finally, once agreement is reached with the board I will create project charters and re-factor any changes needed from the board discussion into the architecture.

Answer: D

 

NEW QUESTION 27
Patterns & Co. is introducing a Commercial Off-the-Shelf (COTS) Market Analytics solution in order to improve its new delivery service.
Patterns & Co. has a mature enterprise architecture capability and the CIO is the sponsor of the enterprise architecture team. The business vision and requirements for the new system are defined. It includes a detailed business process analysis. The supplier has proposed a solution but the Architecture Board identified some of the project requirements not consistent with the adopted infrastructure standards. The CIO considered the risks and approved the implementation.
The CIO has asked the EA team to execute the Phase G ensuring that the system performance KPIs are respected, the project remains within budget and security guidelines are met.
Refer to the scenario above As Lead Enterprise Architect you have to recommend a plan to implement the CIO decision. Choose the best answer according to TOGAF 9.
Choose one of the following answers

  • A. You recommend the co-existence of a second web server standard and modify the company Standards Information Base adding this new technology.You ask the project architects to create an Architecture Contract with the development teams. You identify the need of a performance testing and a compliance review You agree with the business on SLA and delivery dates. You identify re-usable procedures and objects.
  • B. You execute a risk analysis and set deliverables and timing requirements with the development team.
    You implement a detailed impact analysis of the chosen solution. You create an Architecture Contract and ask for the CIO's approval before implementing it. You test the solution just prior to implementation and deliver the project artifacts and store after the completion of the implementation.
  • C. You ask the supplier to modify the web server hardware and software components so they can meet the current infrastructure standards. You advise to execute a proof of concept to anticipate any coding issue. Then, after the agreement with the development leads for supporting the development, you will provide the project plan to the project manager and develop an Architecture Contract. A set of frequent operational reviews to monitor the solution's performance is then scheduled after the implementation is completed.
  • D. You eliminate the non-standard web server from the solution as recommended by the Architecture Board. You create a revised plan and Architecture Contract for the development stressing the re-use of standard technologies. You share the budget implication of this solution with a finance committee and inform the CIO of the long term cost benefits of this choice. You define periodical project management meetings to monitor compliance.

Answer: A

 

NEW QUESTION 28
......


Target Audience

The intended candidates for the OG0-092 exam are those individuals who want to gain advanced knowledge of the TOGAF 9 Standard. It is ideal for the professionals who are already employed in the organizations where the TOGAF 9 Standard is adopted and who take part in architecture projects or initiatives. The target audience for the test also involves the architects who are looking to incorporate the TOGAF 9 Standard into their architecture practice as well as those who want to obtain a sought-after certification to demonstrate their in-depth expertise in the TOGAF 9 Standard.

 